PROJECT EXPERIENCE

Selected experience of
our lead experts.

Representative assignments demonstrating the technical, project-management and multidisciplinary coordination experience of the lead experts behind Three Steps Ahead and the scale of projects the practice is structured to support.

Reference note. Three Steps Ahead is a newly established engineering practice. The assignments below represent professional experience gained by its lead experts, including work performed prior to the establishment of the company. They are not presented as corporate references of Three Steps Ahead unless expressly stated otherwise.
01
Hydropower · Power Systems · Peru

MANTARO HYDROPOWER COMPLEX — PERU

Recent project-management and senior engineering experience supporting major rehabilitation, modernization and grid-integration initiatives for the Mantaro generation complex.

  • Project-management and multidisciplinary coordination responsibilities for preparation of tender documentation for RON HPP and associated SECA 220 kV systems.
  • Technical requirements for rehabilitation and uprating of the RON generating units, including generators, excitation, step-up transformers, generator-voltage equipment and auxiliary interfaces.
  • Protection, control, SAS/SCADA and 220 kV SECA switchyard modernization interfaces, together with BESS integration requirements.
  • Market study / market consultation, procurement support, technical clarifications, interface management and definition of FAT/SAT, commissioning and acceptance requirements.
02
Hydropower Rehabilitation · Serbia

HPP IRON GATE 1 — SERBIA

Long-term senior experience on rehabilitation and modernization of one of Europe’s major hydropower plants (6 generating units, up to 211 MVA per unit).

  • Review of manufacturer and contractor documentation, execution/as-built design and supervision for electrical equipment during successive unit rehabilitation stages.
  • Generating-unit systems, step-up transformers, auxiliaries, monitoring and multidisciplinary interfaces.
  • Senior design, project-management and supervision responsibilities across multiple rehabilitation phases.
  • Additional expert experience related to performance testing and international technical presentations on the modernization programme.
03
Pumped Storage · Serbia

PSPP BISTRICA — SERBIA

Engineering for a major pumped-storage project with four 175 MVA units.

  • Feasibility, basic/main design and tender documentation for electrical equipment.
  • Motor-generators and excitation, generator-voltage equipment, step-up transformers and auxiliary power supply.
  • Protection systems, fire-protection interfaces, lightning protection and multidisciplinary coordination.
  • Technical requirements developed with procurement, testing and implementation interfaces in mind.
04
Hydropower · HV Infrastructure · Bosnia & Herzegovina

HPP DABAR — BOSNIA & HERZEGOVINA

Owner-side technical review and supervision support for a new 3 × 60 MVA hydropower project and associated HV infrastructure.

  • Review of Contractor’s main/detailed design and manufacturing documentation.
  • Electrical equipment of the hydropower plant, 220 kV switchyard and 220 kV overhead transmission lines.
  • FAT documentation and supervision, equipment compliance and technical clarifications.
  • Coordination of design, manufacturing and site-interface issues.
05
Hydropower Rehabilitation · Serbia

VLASINSKE HPP CASCADE — SERBIA

Tender preparation and bid-evaluation experience for rehabilitation of generating units and associated electrical equipment.

  • Contract conditions and particular technical requirements for generators and excitation systems.
  • Generator-voltage equipment and protection systems.
  • Technical clarifications, evaluation of bids and interface review.
  • Application of international procurement and rehabilitation requirements to existing plants.
06
Hydropower Rehabilitation · Serbia

HPP POTPEĆ — SERBIA

Combined lead-expert experience across several rehabilitation and modernization assignments for the 3 × 20 MVA hydropower plant.

  • Basic Design and Tender Documentation for rehabilitation of generators, excitation systems, generator-voltage equipment and step-up transformers.
  • Design and tender requirements for monitoring systems of generating units and step-up transformers.
  • Earlier design experience related to auxiliary power-supply reconstruction and tender/consulting support for plant lifting equipment.
  • Integration of rehabilitation requirements with existing plant conditions, maintainability and operational constraints.
07
New Hydropower · Iraq

HPP MAKHOOL — IRAQ

Basic design experience for a new 3 × 130 MVA hydropower plant.

  • Generators and excitation systems, generator-voltage equipment and step-up transformers.
  • Auxiliary power supply, electrical protection and fire alarm/extinguishing systems.
  • 123 kV switchyard and regulating transformers.
  • Multidisciplinary design coordination in an international project environment.
08
Hydropower EPC Tendering · Bosnia & Herzegovina

HPP BUK BIJELA — BOSNIA & HERZEGOVINA

Tender-documentation experience for EPC implementation of a major hydropower project.

  • Electrical protection requirements for generating units and step-up transformers.
  • Protection requirements for the associated 110/220 kV transformer station.
  • Technical specifications structured for EPC procurement and design responsibility.
09
Dam & Water Infrastructure · Peru

POECHOS DAM — PERU

Electrical engineering for emergency spillway electro-hydraulic equipment and associated infrastructure.

  • Basic and detailed design.
  • Tender documentation for complete electrical-equipment supply and installation.
  • Consulting support and multidisciplinary electro-hydraulic interfaces.
10
Dams & Water Transfer · Algeria

SEKLAFA & CHERGUI DAMS / WATER TRANSFER — ALGERIA

International design and supervision experience for major dam and water-transfer infrastructure.

  • Detailed design and tender documentation for electrical equipment and installations.
  • Site inspections and review of Contractor’s detailed/as-built and quality documentation.
  • Senior design and supervision responsibilities in a multidisciplinary environment.
11
Navigation Infrastructure · Serbia

IRON GATE NAVIGATION LOCKS & TISA WATERWAY PROJECTS — SERBIA

Senior electrical design, project-management and supervision experience for modernization of major navigation and water-control facilities.

  • Project-management responsibilities for Iron Gate 1 and Iron Gate 2 navigation-lock assignments, including overall coordination of multidisciplinary design activities.
  • Design development, construction documentation and as-built documentation for control, SCADA, power-supply and electro-hydraulic systems.
  • Manufacturer-documentation review, FAT/site inspection and supervision experience across successive modernization stages.
  • Electrical and control-system interfaces for navigation and water-control infrastructure, including work associated with the Tisa dam.